Projects

A proven track record across Malaysia's offshore fields

From flagship redevelopments to specialised fabrication packages — delivered for operators and EPCIC contractors across Sabah, Sarawak and beyond.

PROJECTS TRACKED
67
EARLIEST PROJECT
1998
CURRENT
SIRUNG · BAYAN PH3

/ 01 · CURRENT & RECENT

Current & recent major projects

Major structural, piping and offshore packages currently in execution or recently completed.

2026 – Ongoing IMG

PTTEP / Brooke Holding

Sirung Production Platform

Major structural and piping fabrication packages supporting the delivery of PTTEP's Sirung Production Platform.

Structural Fabrication: RM34.8 Million · Piping Fabrication: RM17.1 Million · Total Awarded Scope: RM51.9 Million

2023 – 2025 IMG

Shell / Brooke Holding

F6 VLAP Compression Project

High-volume structural and piping fabrication supporting Shell's F6 VLAP Compression Project.

Piping Fabrication: RM25.8 Million · Structural Fabrication: RM23.8 Million

2025 – 2026 IMG

PETRONAS / Dialog / Brooke Holding

Baram Junior Cluster Development

Multi-package execution covering onshore structural & piping fabrication, BNCPP-B modification and tie-in works, mechanical integration, pre-commissioning, offshore installation aids, and the supply of manpower, equipment, tools and consumables.

Total Awarded Scope: RM40.35 Million

2026 – Ongoing IMG

PETRONAS / Dialog

Bayan Redevelopment Phase 3

Onshore fabrication, NDT, and offshore HUC manpower and equipment support for the Bayan Redevelopment Phase 3 infill drilling programme.

Onshore Fabrication & NDT: RM5.1 Million · Hook-Up & Commissioning Support: RM10.388 Million · Total Awarded Scope: RM15.49 Million

/ 02 · LANDMARK

Selected landmark projects

Completed packages that shaped IFESB's reputation with operators and EPCIC contractors.

2021 – 2022

Shell / Brooke Dockyard

TIMI Development

Structural and piping fabrication for Malaysia's first hybrid-powered unmanned wellhead platform tied into the F23 production hub.

Piping & Structural Fabrication: RM23.6 Million

2021 – 2022

PETRONAS / Dialog / Labuan Shipyard

Bayan Gas Phase 2

Fabrication, assembly, seafastening, load-out and HUC support for the Bayan Gas Phase 2 redevelopment.

Combined Structural, Piping & HUC Scope: RM23.2 Million

2023 – 2024

Hibiscus / Brooke Holding

South Furious 30 Water Flood Phase 2

Structural and piping fabrication supporting offshore waterflood enhancement at the SF30 field.

Piping Fabrication: RM6.9 Million · Structural Fabrication: RM9.6 Million · Total Awarded Scope: RM16.5 Million

/ 03 · CORPORATE TRACK RECORD

IFESB corporate track record

Projects delivered by Ironfield Engineering Sdn. Bhd. since its incorporation on 19 March 2013.

Year Project Client Owner Contract sum
2026–Awarded Sirung Production Platform (EPC) — Piping Subcontracting Works Brooke Holding PTT Exploration & Production RM17.1M
2026–Ongoing Sirung Production Platform (EPC) — Structural Fabrication Subcontracting Works Brooke Holding PTT Exploration & Production RM34.8M
2026–Ongoing Bayan Redevelopment Phase 3 (ePCC) — Manpower, Equipment, Tools & Consumables for Hook-Up & Commissioning Dialog E & C PETRONAS Carigali RM10.388M
2026 Bayan Redevelopment Phase 3 (ePCC) — Onshore Fabrication & Non-Destructive Testing Dialog E & C PETRONAS Carigali RM5.1M
2025–2026 Baram Junior Cluster — Fabrication of Offshore Installation Aids & Supply of Manpower, Equipment, Tools and Consumables Dialog E & C Dialog E & C RM9.815M
2025–2026 Baram Junior Cluster — Minor Fabrication, Installation, Mechanical Integration & Pre-Commissioning Dialog E & C Dialog E & C RM1.980M
2025–2026 Baram Junior Cluster — Salbiah Wellhead Platform (SLDP-A) ePCC, Structural Fabrication Works Brooke Holding Dialog E & C RM7.380M
2025 Baram Junior Cluster — Pre-Fabrication, Structural of Salbiah Wellhead Platform Dialog E & C Dialog E & C RM2.034M
2025 Baram Junior Cluster — Onshore Fabrication, Piping SLDP-A Dialog E & C Dialog E & C RM5.215M
2025 Baram Junior Cluster — Manpower, Equipment, Tools & Consumables for BNCPP-B Modification and Host Tie-In Dialog E & C PETRONAS Carigali RM8.980M
2025 Baram Junior Cluster — Onshore Fabrication (Structural) Brooke Holding PETRONAS Carigali RM2.484M
2025 Baram Junior Cluster — Onshore Fabrication for Brownfield Piping & Salbiah WHP Hook-Up & Commissioning Dialog E & C PETRONAS Carigali RM2.462M
2023–2025 F6 VLAP Compression Project — Structural Subcontracting Works Brooke Holding Shell RM23.8M
2023–2025 F6 VLAP Compression Project — Piping Subcontracting Works Brooke Holding Shell RM25.8M
2023 Bayan Wells — Ridhwan String Surface Modification for Gas Lift, HUC Works (Scope 3) Dialog E & C PETRONAS Carigali RM1.9M
2023–2024 South Furious 30 Water Flood Phase 2 (EPCI) — Piping Fabrication Brooke Dockyard Sea Hibiscus RM6.9M
2023–2024 South Furious 30 Water Flood Phase 2 (EPCI) — Structural Fabrication Brooke Dockyard Sea Hibiscus RM9.6M
2022 Longi Kuching — RODI Water System Installation & Commissioning Nanjing Auto Purifying Engineering Longi RM0.37M
2022 Bayan Gas Phase 2 — Manpower, Equipment, Tools & Consumables for Platform Modification and HUC Dialog E & C PETRONAS Carigali RM18.1M
2022 TIMI Development — Piping Fabrication (EPC of Fixed Offshore Structure Works) Brooke Dockyard Sarawak Shell RM7.2M
2021–2022 Bayan Gas Phase 2 — Supply, Fabrication, Assembly, Seafastening & Load Out (Structural & Piping) Labuan Shipyard & Engineering Dialog E & C RM5.1M
2021–2022 TIMI Development — Structural Fabrication (EPC of Fixed Offshore Structure Works) Brooke Dockyard Sarawak Shell RM16.4M
2019–2020 Submarine Pipeline — Butterworth to Pulau Pinang Wira Syukur Wibawa Perbadanan Bekalan Air Pulau Pinang RM3.8M
2019–2020 Bayan Redevelopment PH 2B/2C — Offshore Installation & HUC Dialog E & C PETRONAS Carigali RM11.1M
2019–2020 Bayan Redevelopment PH 2B/2C — Piping Fabrication Dialog E & C PETRONAS Carigali RM3.7M
2019–2020 Bayan Redevelopment PH 2B/2C — Structural Fabrication Dialog E & C PETRONAS Carigali RM2.0M
2019 Bokor Phase 3 Redevelopment Wellhead Platform — Piping Fabrication Brooke Dockyard PETRONAS Carigali RM2.8M
2018–2019 Bokor Phase 3 Redevelopment Wellhead Platform (FEED EPCIC) — Structural Fabrication Brooke Dockyard PETRONAS Carigali RM5.8M
2018–2019 EPCC for Anjung Facilities — Piping Fabrication Brooke Dockyard PETRONAS Carigali RM5.8M
2018 EPCC for Anjung Facilities — Mechanical Fabrication Brooke Dockyard PETRONAS Carigali RM0.55M
2017–2018 EPCC for Anjung Facilities — Structural Fabrication Brooke Dockyard PETRONAS Carigali RM4.2M
2017 E6DP-A Topside & Jacket — Piping Fabrication Brooke Dockyard Sarawak Shell RM4.8M
2016–2017 E6DP-A Topside & Jacket — Structural Fabrication Brooke Dockyard Sarawak Shell RM10.0M
2015–2016 SA-SA Topside Facilities — Piping Fabrication Brooke Dockyard Murphy Sarawak Oil RM4.3M
2015–2016 SA-SA Topside Facilities — Structural Fabrication Brooke Dockyard Murphy Sarawak Oil RM2.5M
2014–2015 Package 5 Submarine Pipeline — Tanjung Manis Water Pipeline PPES Works PPES Works RM2.42M
2014–2016 SA-SA Topside Facilities — Mechanical Fabrication Brooke Dockyard Murphy Sarawak Oil RM0.73M
2014–2015 D35DP-A Facilities Modification & Well Tie-In for CTU Drilling Dialog E & C PETRONAS RM1.75M
2014 BYDP-B Deck Extension Work (Onshore & Offshore) Dialog E & C PETRONAS RM6.42M
2014 SA-SA Jacket — Fabrication Subcontracting Brooke Dockyard Murphy Sarawak Oil RM4.2M
2014 SA-PA & SA-AA Topside — Offshore Manpower Supply Brooke Dockyard Murphy Sarawak Oil
2013 SA-PA & SA-AA Topside — Piping Fabrication & Installation Subcontracting Brooke Dockyard Murphy Sarawak Oil RM12.62M
2013 SA-PA & SA-AA Topside — Structural Fabrication & Installation Subcontracting Brooke Dockyard Murphy Sarawak Oil RM1.0M

/ 04 · LEGACY · 1998 – 2012

Legacy & management experience

The projects in this section reflect the collective execution experience of IFESB's founding management and technical personnel before the incorporation of Ironfield Engineering Sdn. Bhd. in 2013.

Year Project Client Owner Contract sum Tonnage
1998–1999 MALONG-A Topside & Jacket Brooke Dockyard PETRONAS 700 MT
1999 St. Joseph GRS Compression Module Brooke Dockyard SSB/SSPC RM3.2M 1,200 MT
1999 D35JT-C Topside Brooke Dockyard SSB/SSPC RM0.55M 143 MT
2000–2001 Angsi-B Topside Brooke Dockyard PETRONAS RM9.0M 2,000 MT
2000–2001 South Furious Jacket / Topside Brooke Dockyard SSB/SSPC RM2.65M
2002 Jintan-A Topside — Piping Fabrication Brooke Dockyard SSB/SSPC RM6.0M
2002–2003 BR-C & BK-C Topside — Piping Fabrication Brooke Dockyard Talisman Malaysia RM5.3M
2002–2003 BR-C & BK-C Topside & Substructure (Skid Packages / Launcher / Receiver) Brooke Dockyard Talisman Malaysia RM0.95M
2003 Bunga Raya A Central Processing Platform (EPIC BR-A CPP) Topside — Technical Assistance Hyundai Heavy Industries Talisman Malaysia RM3.6M
2003 Fairley 4 — Living Quarters Replacement (Steelworks Fabrication & Construction) Adinin Works & Engineering Brunei Shell Petroleum RM2.8M
2003 Permas Production (PR-PA) Topside EPCC — Structural Fabrication Brooke Dockyard Murphy Sarawak Oil
2003 Murphy's West Patricia WP-IA Topside — Piping Fabrication Brooke Dockyard Murphy Sarawak Oil RM1.06M
2003 Murphy's West Patricia WP-IA Topside — Structural Fabrication Brooke Dockyard Murphy Sarawak Oil RM1.06M
2003 Serai Subsea Production (Manifold, Pressure Vessel & Tie-In Materials) — Piping Fabrication Brooke Dockyard Shell Oil & Gas (Malaysia) RM1.4M
2006 SFJT-E Platform & Prefab Works for M3S & G7 (Topside & Jacket) Brooke Dockyard Sarawak Shell
2006–2007 Containerized Control Room Fabrication Adinin Works & Engineering Brunei Shell Petroleum
2006–2007 Jerneh-B Topside & Jacket — Structural Fabrication Brooke Dockyard ExxonMobil Malaysia
2006–2011 Oilfield Equipment Services Expro Oilfield Services
2007–2008 Piping Rack Fabrication PETRONAS Methanol (Labuan) PETRONAS
2008 Sea Fastening Work for F23 & F6 Living Quarters Brooke Dockyard Sarawak Shell RM0.7M
2008–2009 Cold Cut & Plasma Cutting Service Petra Resources Sarawak Shell
2008–2011 Cilipadi Project F23 & F28 — Structural & Piping Fabrication Remunia Fabricator Sarawak Shell
2011–2012 Cold Cut & Plasma Cutting Services Mega United Resources
2011–2012 Fabrication & Installation Subcontracting Works Transocean Drilling

/ 05 · GALLERY

Service photos

A look at our fabrication workshop and offshore activities.

Cold Cutting of Existing Piping

GTAW Root-Pass Welding

Submerged Arc Welding of Structural Component

Controlled Welding Area for Special Materials

Large-Bore Pipe Assembly

Stainless Steel Piping Spool

Piping Spool Installation

Topside Steel Structure Fabrication

Topside Padeye Fabrication

Haunch Beam Fabrication

SAW Process

Stabbing Cone Fabrication

Trunnion Fabrication

Jacket Structure Fabrication

J-Tube Fabrication

Pile Fabrication

Conductor Fabrication

Clamp Fabrication

Handrail Fabrication

Stairway Fabrication

Lifting Frame Fabrication

Pile Sleeve Fabrication

Prefabrication of 1200Ø Water Pipeline

Fit-Up Pipeline at Launching Bay

Hydrotesting (3.8 km × 2 Lines)

Land Pipeline Tie-In