| 2026–Awarded |
Sirung Production Platform (EPC) — Piping Subcontracting Works |
Brooke Holding |
PTT Exploration & Production |
RM17.1M |
| 2026–Ongoing |
Sirung Production Platform (EPC) — Structural Fabrication Subcontracting Works |
Brooke Holding |
PTT Exploration & Production |
RM34.8M |
| 2026–Ongoing |
Bayan Redevelopment Phase 3 (ePCC) — Manpower, Equipment, Tools & Consumables for Hook-Up & Commissioning |
Dialog E & C |
PETRONAS Carigali |
RM10.388M |
| 2026 |
Bayan Redevelopment Phase 3 (ePCC) — Onshore Fabrication & Non-Destructive Testing |
Dialog E & C |
PETRONAS Carigali |
RM5.1M |
| 2025–2026 |
Baram Junior Cluster — Fabrication of Offshore Installation Aids & Supply of Manpower, Equipment, Tools and Consumables |
Dialog E & C |
Dialog E & C |
RM9.815M |
| 2025–2026 |
Baram Junior Cluster — Minor Fabrication, Installation, Mechanical Integration & Pre-Commissioning |
Dialog E & C |
Dialog E & C |
RM1.980M |
| 2025–2026 |
Baram Junior Cluster — Salbiah Wellhead Platform (SLDP-A) ePCC, Structural Fabrication Works |
Brooke Holding |
Dialog E & C |
RM7.380M |
| 2025 |
Baram Junior Cluster — Pre-Fabrication, Structural of Salbiah Wellhead Platform |
Dialog E & C |
Dialog E & C |
RM2.034M |
| 2025 |
Baram Junior Cluster — Onshore Fabrication, Piping SLDP-A |
Dialog E & C |
Dialog E & C |
RM5.215M |
| 2025 |
Baram Junior Cluster — Manpower, Equipment, Tools & Consumables for BNCPP-B Modification and Host Tie-In |
Dialog E & C |
PETRONAS Carigali |
RM8.980M |
| 2025 |
Baram Junior Cluster — Onshore Fabrication (Structural) |
Brooke Holding |
PETRONAS Carigali |
RM2.484M |
| 2025 |
Baram Junior Cluster — Onshore Fabrication for Brownfield Piping & Salbiah WHP Hook-Up & Commissioning |
Dialog E & C |
PETRONAS Carigali |
RM2.462M |
| 2023–2025 |
F6 VLAP Compression Project — Structural Subcontracting Works |
Brooke Holding |
Shell |
RM23.8M |
| 2023–2025 |
F6 VLAP Compression Project — Piping Subcontracting Works |
Brooke Holding |
Shell |
RM25.8M |
| 2023 |
Bayan Wells — Ridhwan String Surface Modification for Gas Lift, HUC Works (Scope 3) |
Dialog E & C |
PETRONAS Carigali |
RM1.9M |
| 2023–2024 |
South Furious 30 Water Flood Phase 2 (EPCI) — Piping Fabrication |
Brooke Dockyard |
Sea Hibiscus |
RM6.9M |
| 2023–2024 |
South Furious 30 Water Flood Phase 2 (EPCI) — Structural Fabrication |
Brooke Dockyard |
Sea Hibiscus |
RM9.6M |
| 2022 |
Longi Kuching — RODI Water System Installation & Commissioning |
Nanjing Auto Purifying Engineering |
Longi |
RM0.37M |
| 2022 |
Bayan Gas Phase 2 — Manpower, Equipment, Tools & Consumables for Platform Modification and HUC |
Dialog E & C |
PETRONAS Carigali |
RM18.1M |
| 2022 |
TIMI Development — Piping Fabrication (EPC of Fixed Offshore Structure Works) |
Brooke Dockyard |
Sarawak Shell |
RM7.2M |
| 2021–2022 |
Bayan Gas Phase 2 — Supply, Fabrication, Assembly, Seafastening & Load Out (Structural & Piping) |
Labuan Shipyard & Engineering |
Dialog E & C |
RM5.1M |
| 2021–2022 |
TIMI Development — Structural Fabrication (EPC of Fixed Offshore Structure Works) |
Brooke Dockyard |
Sarawak Shell |
RM16.4M |
| 2019–2020 |
Submarine Pipeline — Butterworth to Pulau Pinang |
Wira Syukur Wibawa |
Perbadanan Bekalan Air Pulau Pinang |
RM3.8M |
| 2019–2020 |
Bayan Redevelopment PH 2B/2C — Offshore Installation & HUC |
Dialog E & C |
PETRONAS Carigali |
RM11.1M |
| 2019–2020 |
Bayan Redevelopment PH 2B/2C — Piping Fabrication |
Dialog E & C |
PETRONAS Carigali |
RM3.7M |
| 2019–2020 |
Bayan Redevelopment PH 2B/2C — Structural Fabrication |
Dialog E & C |
PETRONAS Carigali |
RM2.0M |
| 2019 |
Bokor Phase 3 Redevelopment Wellhead Platform — Piping Fabrication |
Brooke Dockyard |
PETRONAS Carigali |
RM2.8M |
| 2018–2019 |
Bokor Phase 3 Redevelopment Wellhead Platform (FEED EPCIC) — Structural Fabrication |
Brooke Dockyard |
PETRONAS Carigali |
RM5.8M |
| 2018–2019 |
EPCC for Anjung Facilities — Piping Fabrication |
Brooke Dockyard |
PETRONAS Carigali |
RM5.8M |
| 2018 |
EPCC for Anjung Facilities — Mechanical Fabrication |
Brooke Dockyard |
PETRONAS Carigali |
RM0.55M |
| 2017–2018 |
EPCC for Anjung Facilities — Structural Fabrication |
Brooke Dockyard |
PETRONAS Carigali |
RM4.2M |
| 2017 |
E6DP-A Topside & Jacket — Piping Fabrication |
Brooke Dockyard |
Sarawak Shell |
RM4.8M |
| 2016–2017 |
E6DP-A Topside & Jacket — Structural Fabrication |
Brooke Dockyard |
Sarawak Shell |
RM10.0M |
| 2015–2016 |
SA-SA Topside Facilities — Piping Fabrication |
Brooke Dockyard |
Murphy Sarawak Oil |
RM4.3M |
| 2015–2016 |
SA-SA Topside Facilities — Structural Fabrication |
Brooke Dockyard |
Murphy Sarawak Oil |
RM2.5M |
| 2014–2015 |
Package 5 Submarine Pipeline — Tanjung Manis Water Pipeline |
PPES Works |
PPES Works |
RM2.42M |
| 2014–2016 |
SA-SA Topside Facilities — Mechanical Fabrication |
Brooke Dockyard |
Murphy Sarawak Oil |
RM0.73M |
| 2014–2015 |
D35DP-A Facilities Modification & Well Tie-In for CTU Drilling |
Dialog E & C |
PETRONAS |
RM1.75M |
| 2014 |
BYDP-B Deck Extension Work (Onshore & Offshore) |
Dialog E & C |
PETRONAS |
RM6.42M |
| 2014 |
SA-SA Jacket — Fabrication Subcontracting |
Brooke Dockyard |
Murphy Sarawak Oil |
RM4.2M |
| 2014 |
SA-PA & SA-AA Topside — Offshore Manpower Supply |
Brooke Dockyard |
Murphy Sarawak Oil |
— |
| 2013 |
SA-PA & SA-AA Topside — Piping Fabrication & Installation Subcontracting |
Brooke Dockyard |
Murphy Sarawak Oil |
RM12.62M |
| 2013 |
SA-PA & SA-AA Topside — Structural Fabrication & Installation Subcontracting |
Brooke Dockyard |
Murphy Sarawak Oil |
RM1.0M |